|
|
|
|
|
|
|
|
|
|
|
|
|
|
ANALISIS PERHITUNGAN HARGA POKOK PRODUKSI SEBAGAI DASAR PENENTUAN HARGA JUAL PADA PT PAPUA KARYA JAYA
Abstract
This study aims to analyze and calculate the cost of production of paving blocks and determine the selling price of paving blocks at PT Papua Karya Jaya. Data collection techniques in this study are observation, interview and documentation techniques. The data analysis instrument in this research uses the full costing method to calculate the cost of production and the cost plus pricing method to calculate the selling price. This research is a descriptive research. The results of this study indicate that the cost of production using the full costing method is Rp. 893,465,787 with a selling price per unit of Rp. 4,632.
Most read articles by the same author(s)
- Ayu Indrawati, Daniel Nemba Dambe, ANALISIS KINERJA KEUANGAN PERUSAHAAN PADA PT BANK PEMBANGUNAN DAERAH PAPUA BERDASARKAN ANALISIS RASIO KEUANGAN , JURNAL ULET (Utility, Earning and Tax): Vol 5 No 2 (2021): JURNAL ULET (Utility, Earning and Tax)
- Mariana Tandi, Daniel Nemba Dambe, ANALISIS PENENTUAN HARGA POKOK PRODUKSI DENGAN METODE FULL COSTING DAN VARIABLE COSTING PADA USAHA PENJAHIT DEWANTA , JURNAL ULET (Utility, Earning and Tax): Vol 6 No 1 (2022): JURNAL ULET (Utility, Earning and Tax)
- Aloysius Danduru Pabendon, Daniel Nemba Dambe, Analisis Struktur Modal Dan Efektivitaspenggunaan Modal Kerja Pada Toko Megaloy SP 3 , Journal of Financial and Tax: Vol 3 No 1 (2023): Journal of Financial and Tax
- Revlin Lambang, Daniel Nemba Dambe, Analisis Harga Pokok Produksi dan Break Even Point Pada UD Niki Mawon , JURNAL ULET (Utility, Earning and Tax): Vol 7 No 2 (2023): JURNAL ULET (Utility, Earning and Tax)