ANALISIS PERHITUNGAN HARGA POKOK PRODUKSI SEBAGAI DASAR PENENTUAN HARGA JUAL PADA PT PAPUA KARYA JAYA

Authors

  • Daniel Nemba Dambe
  • Jasi Okta Filan

Abstract

This study aims to analyze and calculate the cost of production of paving blocks and determine the selling price of paving blocks at PT Papua Karya Jaya. Data collection techniques in this study are observation, interview and documentation techniques. The data analysis instrument in this research uses the full costing method to calculate the cost of production and the cost plus pricing method to calculate the selling price. This research is a descriptive research. The results of this study indicate that the cost of production using the full costing method is Rp. 893,465,787 with a selling price per unit of Rp. 4,632.

Downloads

Published

2022-10-29

How to Cite

ANALISIS PERHITUNGAN HARGA POKOK PRODUKSI SEBAGAI DASAR PENENTUAN HARGA JUAL PADA PT PAPUA KARYA JAYA. (2022). JURNAL ULET (Utility, Earning and Tax), 6(2), 110-124. http://ejournal.stiejb.ac.id/index.php/jurnal-ulet/article/view/240

Most read articles by the same author(s)